Prefab pool house with bathroom and kitchen beside a pool at golden hour

A Prefab Pool House with Bathroom and Kitchen, Delivered Turnkey

The NOOK Doble answers the search exactly: 19.5 m² of poolside living, factory-fitted with a shower, a loo and a kitchen, set on helical piles in a day. No concrete slab, no months of contractors crossing your garden.

The answer, plainly

19.5 m² of poolside living, with bathroom and kitchen configured to order

01 Footprint
The full NOOK Doble, beside the water.
19.5 m²poolside footprint
02 Capacity
Room enough to change, shower and sit in the shade.
Up to 6seats & sleeps
03 Configuration
Bathroom and kitchen are added to order, at the factory.
Bathroom & kitchenconfigured to order
  • Turnkey delivered complete
  • Days, not months order to installed
  • Helical piles no concrete slab
  • 3 years structural warranty
  • European-engineered Spain, Germany & Florida

The case for it

Everything your poolside is missing, in one building

Right now the pool sends wet, chlorinated feet across your floors, sun-tired guests hunt for a bathroom indoors, and every cold drink means the long walk back to the kitchen.

Changing area beside the pool inside a NOOK

Dry off without crossing the house.

Peel off wet things and dry off, a few steps from the water.

Full ensuite bathroom inside a poolside NOOK Doble

A proper shower and a toilet.

So no one tracks through the house.

Fitted kitchen inside a poolside NOOK Doble

A fridge and a worktop, poolside.

For the long afternoons and the evenings after.

Poolside NOOK out of swimming season

It still works once the cover is on.

Insulated and glazed, so it still works once the cover is on the pool.

The golden hour

The afternoon that no longer ends at the back door

Poolside NOOK at golden hour with doors open to the deck

Doors open to the deck, the pool mirror-still under a fading sky.

The proof

Bathroom and Kitchen, Built In at the Factory

The Doble leaves the factory with its plumbing and wiring already in. Con Baño Completo adds a shower, toilet and basin. Baño + Cocina adds a refrigerator, worktop and storage. Baño + Esquina NOOK folds in a sofa-bed. On site you bring fresh water and waste to the nearest point, and we make the final connections on the day it lands.

  1. NOOK Doble Diáfano open-plan layout
    01 Diáfano

    Diáfano — the open shell

    One clear, insulated 19.5 m² room. The factory plumbing and wiring are already in, ready for whichever layout you choose.

    Configure this layout
  2. NOOK Doble interior with full ensuite bathroom
    02 Con Baño Completo

    Con Baño Completo — the full ensuite

    Adds a full bathroom — a shower, a toilet and a basin — finished as a wet room with a sloped floor to the drain.

    Configure this layout
  3. Prefab pool house with bathroom and kitchen — poolside kitchenette
    03 Baño + Cocina

    Baño + Cocina — the fitted kitchenette

    Adds a fitted kitchen to the bathroom: a refrigerator, a worktop and storage along one wall.

    Configure this layout
  4. NOOK Doble corner sofa-bed configuration
    04 Baño + Esquina NOOK

    Baño + Esquina NOOK — the corner sofa-bed

    Adds the corner sofa-bed, so the pool house becomes a guest room once the sun goes down.

    Configure this layout

The full spec, opened up

Everything included with your NOOK pool house — no hidden extras

Structure, bathroom, kitchen, transport, crane, foundation and connections. All inside the configurator price.

NOOK Doble interior with bathroom and kitchen beside the pool
What the price includes
  • Full factory assembly
  • Transport to your destination
  • Crane hire and offloading
  • Helical-pile foundation
  • Electrical and plumbing pre-install
  • Single-day on-site install labour
  • Handover and final quality checklist
Full ensuite (configured to order)
  • Shower with tempered-glass screen
  • Toilet and basin
  • Wet-room tiling
  • Integrated towel rail
  • Ventilation extractor and LED mirror
Fitted kitchen (configured to order)
  • Worktop with tap
  • Stainless-steel sink
  • Space for undercounter fridge, induction hob and microwave
  • Storage cabinets
  • Under-cabinet lighting
How it connects on site
  • You bring fresh water and waste to the nearest point
  • We make the final connections on install day
  • No first-fix trades, no second visit

Inside the bathroom and kitchen

Prefab pool house bathroom interior — tiled wet room with shower, toilet and basin

Inside · the bathroom

Shower, toilet and basin, tiled and sealed, with the floor falling to a single drain. Double-tempered glazing keeps it warm and bright.

Prefab pool house kitchenette — worktop, sink and undercounter fridge along one wall

Inside · the kitchen

A refrigerator, a worktop and storage along one wall, plumbed into the same supply and waste as the bathroom.

Why it costs what it costs

Permanent-building specification, in millimetres

Permanent-building materials. No adjectives — just the spec.

01 — STRUCTURE

50 mm

High-density sandwich panel

Reinforced steel frame with 50 mm high-density sandwich-panel cladding and rock-wool partitions — structural and fire resistance, not just looks.

02 — INSULATION & ROOF

80 mm

No thermal bridges

80 mm of under-structure insulation (145 kg/m³), an EPDM roof and a double false ceiling. Double safety-tempered glazing on both faces.

03 — FINISH

Zenwood or Millboard

Heat-treated or zero-maintenance composite

Heat-treated Zenwood timber in Negro or Roble (re-lacquer every 5 years), or premium Millboard composite, maintenance-free for 25+ years.

Materials, up close

Charcoal heat-treated Zenwood timber cladding macro detail

Heat-treated timber

Charcoal-black finish, resistant to pool-side humidity and sun, chemical-free.

Double safety-tempered glazing on a NOOK Doble garden room

Safety-tempered glazing

Double-tempered glazing on both faces, for steady light and temperature.

Millboard composite cladding in a charcoal finish, maintenance-free

Millboard composite

The zero-maintenance alternative, 25+ years without re-lacquering.

The honest foundation comparison

Helical Piles, Not a Concrete Slab

This is how a reversible foundation changes what you can do beside your pool.

Comparison: NOOK helical-pile foundation versus a traditional concrete slab
Criteria NOOK (helical piles) Traditional concrete slab
Civil works None — half-day install Excavation, formwork and days of curing
Ground impact Reversible — removed with no lasting mark Permanent
Distance to the pool Adapts to almost any ground beside the water Limited by foundation requirements
Certification Mobility & Demountability Certificate N/A — fixed construction
Installation time Half a day, two weeks ahead of delivery Varies — typically several days

Three NOOKs for Poolside. One Is the Pool House.

Each module plays a different role beside the water.

Your Pool House, Built to Order

NOOK Doble with bathroom and kitchen beside the pool
BATHROOM + KITCHEN UP TO 6 PEOPLE LIVING AREA

NOOK Doble – 19.5 m²

Your complete pool house

Changing room with full ensuite, exterior kitchen with sink and worktop, and a lounge with a sofa. When guests arrive, nobody needs to go inside.

Configure Your NOOK Doble

Your pool house, step by step

From deposit to installed, in 8 to 12 weeks.

Ready in 8–12 weeks from deposit
1 week
Technical site validation*
48 hours
Contract and deposit
8–10 weeks
Manufacturing
Half a day (2 weeks before delivery)
Helical piles
1–2 days
Transport
Under 24 hours
Crane and install
1 week
Technical site validation*
48 hours
Contract and deposit
8–10 weeks
Manufacturing
Half a day (2 weeks before delivery)
Helical piles
1–2 days
Transport
Under 24 hours
Crane and install
Your deposit secures your production slot. 100% refundable if your site isn't viable.

*Planning permissions are the customer's responsibility.

Your neighbour is still collecting quotes. You're already swimming.

8–12 weeks
order to installed
vs. 6–12 months of traditional building work
2–3 hours
crane to placed unit
no second-fix visit
< 24 hours
final connections made on install day
plumbing and wiring already factory-fitted
Fixed price
before we manufacture
the price lives in the configurator only

Buy with confidence

Every reason to go ahead

We take responsibility for the process. You decide if NOOK is right for you.

3-year warranty

Structural warranty covering frame, cladding and factory-installed components.

4 factory inspections

Every NOOK passes four quality checks before it leaves the factory.

Reversible foundation

On helical-pile screws: relocate or remove with no permanent land impact.

Private consultation

30 minutes with our design team. No commitment.

The honest colophon

European-engineered, built across our Spain, Germany and Florida production bases. No fabricated proof, no invented testimonials — just the spec sheet and the warranty.

  • Roughly 8 units a month, against a live production calendar
  • 4 factory inspections per unit
  • 3-year structural warranty
NOOK delivery by crane truck

Questions About Prefab Pool Houses

Can a prefab pool house really have a working shower and toilet?

Yes. The NOOK Doble leaves the factory pre-plumbed and pre-wired. The Con Baño Completo layout adds a shower, a toilet and a basin inside the building. On site you bring fresh water and a waste connection to the nearest point, and our team makes the final connections on installation day.

Will it cope with chlorine, splashing and humidity beside a pool?

It is built to permanent-building specification. Double safety-tempered glazing on both faces, an EPDM roof with a double false ceiling, 80 mm under-structure insulation and rock-wool sandwich-panel walls manage damp and temperature. The bathroom zone is finished as a wet room, and charcoal heat-treated timber or no-maintenance composite cladding handles the splash and the sun.

How close to the pool can a NOOK be placed?

Because the building sits on reversible helical screw piles rather than a poured slab, it can be positioned close to the water's edge on almost any ground. The exact setback depends on your local rules and the pool's own structure, which we confirm during the site review before production.

Can the pool house be used in winter, once the cover is back on?

Yes. With 80 mm under-structure insulation, rock-wool walls, double tempered glazing and a full electrical install with dimmable LED and cross-ventilation, the Doble holds temperature year-round. Out of swimming season it works as a guest room, a studio or a quiet room off the garden.

Do I need planning permission for a pool house with a WC?

In many areas a garden building of this size sits within permitted development, but adding a WC and drainage can change what is required, and rules vary by location. Treat this as guidance rather than legal advice: we will talk through your plot during the consultation, and you confirm the position with your local authority.

Preview of the NOOK pool house dossier 32 pages · free

Decide with confidence

Everything you need to know about your pool house, in one PDF

Models, layouts, materials, process and real builds. Sent to your inbox instantly.

  • Full spec sheet for all 3 models — Base, Doble and Sauna
  • All 4 poolside layouts for the Doble
  • Fixed price and exactly what it covers
  • Materials: structure, insulation, roof and finishes
  • 8-to-12-week timeline, step by step
  • Real poolside builds — photos and stories
Your pool house, built to order